Roof Replacement Step by Step: What Actually Happens on Install Day

Watch: 1 min 25 secFilmed in: Westminster, Northwest AustinBy Nick Riley, Driftwood Builders Roofing
Filmed on a real 96-square roof in the Westminster neighborhood of Northwest Austin. Real crew, real tear-off, no stock footage.

A roof replacement starts long before the first new shingle goes on. On install day the crew arrives early, strips the old roof all the way down to the bare wood deck, checks what is underneath, and keeps the property clean the entire time. In this walkthrough, Nick Riley of Driftwood Builders Roofing shows the opening hours of a real Northwest Austin replacement so you know exactly what to expect when the trucks pull up.

The tear-off, step by step

1The crew starts early and works top-down

Install day begins early. On this project the crew arrived at 6:00 a.m. so the hardest, hottest work happens before the Texas afternoon sets in. They start the tear-off at the very top of the roof and work their way down, pulling the old asphalt shingles loose as they go. Starting at the ridge lets gravity help and keeps loosened material moving toward the edge instead of piling up under their feet.

2Flat-bottom tear-off shovels do the heavy lifting

The crew works with specialized tear-off shovels that are flat along the bottom edge. That flat blade slides under the shingles and pops the nails free far faster than prying by hand. Nick calls them incredibly good tools for removing a roof, and on a 96-square roof like this one, having the right tool is the difference between a clean morning and a long, grinding day.

3Stripping the old felt paper underlayment

Once the shingles are off, the crew removes the layer of felt paper underneath. This step matters because a proper replacement goes all the way down to the wood, not just to the old underlayment. Leaving the felt in place would hide whatever is happening on the deck below, so it comes off too, exposing the surface the new roof will actually be built on.

4Inspecting the roof deck

With the shingles and felt paper gone, the bare wood deck is finally visible. This is the moment a roofer can see the true condition of the wood, check for soft or damaged spots, and confirm the surface is sound before any new roofing system goes on. You cannot inspect what you cannot see, which is exactly why the tear-off is taken down to the deck rather than stopping at the old layers.

5Steep-roof safety and cleanup as they go

This particular roof is very steep, so the crew sets couch cushions on the slope to keep their footing and avoid slipping while they work. As shingles come off, they are carried across the roof and dropped straight into the dumpster instead of left to pile up. Keeping the site clean during demolition protects the home and keeps the job organized from the very first hour.

Key takeaways

  • Crews start early, often around 6:00 a.m., and tear off from the ridge down.
  • Flat-bottom tear-off shovels lift the shingles, then the felt paper underneath.
  • Removing the old underlayment exposes the wood deck for a real inspection.
  • Steep roofs call for added footing, like cushions on the slope, to work safely.
  • Debris goes straight to the dumpster, keeping the property clean throughout.

Planning your own roof replacement

A quality roof replacement is far more than nailing on new shingles. The tear-off, the deck inspection, safe work practices, and steady cleanup all decide whether your new roof performs for years. If you are ready to see what a done-right project looks like on your home, learn more about our roof replacement and new roof installation in Austin.

Frequently asked

What is the first step of a roof replacement?

The first step is the tear-off. The crew removes the old asphalt shingles starting at the top of the roof and working down, then strips the felt paper underlayment beneath them so the wood deck is fully exposed.

Why do roofers remove the old felt paper instead of leaving it?

Taking the felt off brings the roof all the way down to the bare deck, which is the only way to inspect the wood for damage. Roofing over old underlayment hides problems that should be found and corrected before the new system goes on.

How do roofers work safely on a steep roof?

On steep slopes the crew adds footing to stay stable. On this project they set couch cushions on the roof so they could keep their grip and avoid slipping while tearing off the old roof and installing the new one.

Video transcript

What happens during a roof replacement? Hey Austin, Nick here with Driftwood Builders Roofing, out on this beautiful 96-square roof in the Westminster neighborhood of Northwest Austin. Our guys came out here at 6:00 a.m., and the first thing they did was start to tear off the old layer of the roof. They use these shovels that are flat on the very bottom, and they start from the very top and tear off the first layer of shingles. The second thing they do is tear off the layer of felt paper underneath. Those shovels are incredibly good tools for removing a roof.

As you can see, this roof is incredibly steep, which is why all of our guys have couch cushions that they set down so they do not slip off. Once the shingles are removed, we carry them all the way over here and throw them in the dumpster.